Production orders (manufacturing)
What's being made, how many, by when — and where each order is on the floor.
Everyone sees the board; owners, admins and managers plan; the person an order is given to moves it along.
1 Plan an order
- Production → New production order: what to make, quantity and unit, due date, priority, product, the account it's for and who does it.
- Each order gets a number (MO-0001).
2 Move it along
- Planned → In production → Quality check → Done (or Cancelled).
- Start and finish times are kept; late orders are flagged.
Given to me shows only your orders. Stock levels are not tracked.
3 Quality checks and the job card
- Shop floor → Record a quality check under an order: stage, pieces checked, defects and the result (Passed, Rework or Failed).
- Rework sends an order waiting for its check back to production; the person it is given to is told when a check doesn't pass.
- Job card prints the order with every check so far and room to sign.
- Owners and admins can switch on the quality gate: an order then can't be marked Done until its newest check passed.
The page shows the defect rate over the last 30 days and warns above the workspace's limit (Settings → Rules & limits → Shop floor).